Electrification Guidance: Hotels
Electrifying Hotels
Why are hotels a challenge to electrify / decarbonize?
What is this resource?
This resource includes operational electrification and decarbonization strategies, specifically for Hotel properties within the City of Palo Alto Utilities’ service territory. This resource provides useful information for Hotel Owners and your contractors or engineers to support electrification upgrades as you apply for available incentives. The guidance includes the following:
Terms to Know
Energy Efficiency Measures
Things to Consider
Additional Resources
Equipment Lists
Note: The equipment lists provide examples of products that would be applicable to a Hotel project and meet the qualifications of CPAU’s Business Customer Rebates. These lists do not serve as endorsements for any specific products.
Terms to Know
PTAC / PTHP (Packaged Terminal Air Conditioner / Packaged Terminal Heat Pump): A self-contained, wall-mounted heating and cooling unit commonly installed through an exterior wall. PTHPs use a heat pump cycle, while PTACs use electric resistance.
AWHP (Air-to-Water Heat Pump): Extracts heat from outdoor air and transfers it to water, which is circulated through the building for heating, cooling, and domestic hot water
DHW (Domestic Hot Water)
Energy Efficiency Measures
HVAC
HVAC systems ensure rooms stay comfortable and healthy. Heating, cooling, and ventilation represent often the largest energy user in hotels, and one with plenty of opportunities to reduce with more efficient equipment. They can directly affect guest experience as well, since a malfunctioning HVAC system will make a room uncomfortable and/or stale.
-
Why we recommend:
Higher heating efficiency
Heating or cooling in any room, anytime (no changeover)
Slim/above-window options free up floor space
Replacement Timeline:
Usually replaced every 15 years
Recommended Measure Pairings:
Window Film (Envelope)
Low-E glazing retrofit (Envelope)
Roof Insulation (Envelope)
Reason for pairing: Reduce load first, since PTHP capacity is limited
-
Why we recommend:
Replaces gas boiler hot water
Reuses existing hot water coils
Replacement Timeline:
Usually replaced every 20 years
Recommended Measure Pairings:
Low-E glazing retrofit (Envelope)
Roof Insulation (Envelope)
Reason for pairing: Reduce heating load first to downsize system
Water Heating
Hot water, primarily for sinks and showers, is a significant source of energy use for hotels. In the mild Bay Area climate, it’s not uncommon for hotels to have higher utility bills for hot water compared to heating. Higher efficiency hot water heating can reduce energy bills.
-
Why we recommend:
Highest efficiency option
Eliminates gas water heating
Ground or roof mounted
Replacement Timeline:
Usually replaced every 13-20 years
Recommended Measure Pairings:
Ozone Laundry
Low-flow plumbing fixtures
Reason for pairing: Reduce hot water load first to downsize system
Envelope
The building envelope is extremely important for building efficiency since it controls the heat entering and leaking from a building, thereby directly correlated towards heating and cooling energy costs. The envelope also protects the building's structure from the elements, meaning a good envelope ensures a building will last longer and be cheaper to operate. A high performing, well-insulated, airtight envelope will help a building feel more comfortable by moderating the exterior wall temperatures, reducing drafts, resulting in guests adjusting their thermostats less.
-
Why we recommend:
Reduces heat gain
Lowers cooling costs
Maintains comfort
Replacement Timeline:
Usually replaced every 10 years
Things to Consider
-
Refrigerants are regulated by the California Air Resources Board (CARB). Using heat pumps with refrigerants that have lower global warming potential (GWP) will reduce carbon emissions as well as protect you against tightening regulatory requirements.
The industry is actively transitioning to refrigerants with lower GWP values. For example, heat pump water heaters using carbon dioxide (CO2, GWP = 1) as a refrigerant are becoming more and more common in the marketplace, and reduce refrigerant impact by 1000x or more. For decarbonizing a building, it is important to consider new heat pump equipment using refrigerants with the lowest GWP available or possibly waiting for those using better refrigerants in the near future.
Existing systems using R-32 and R-454B may be restricted due to flammability. CO2 systems are not in the flammable refrigerants category. Currently PTHP units are only available with R-32 or R-454B, but the total pounds of refrigerant is so low they do not trigger flammability restrictions. CO2 heat pump systems are available for the hydronic mechanical system options and any DHW option.
-
Be careful about the sizing of equipment. Just because you have a 5-ton heat pump today does not mean you should buy another 5-ton heat pump! Previously installed equipment wasn’t necessarily right-sized, so replacing in-kind is not always the right call. Also, Contractors often work from available product sheets, and prefer to oversize equipment rather than risk undersizing, increasing system cost and often operating cost.
Oversized equipment may seem “safe” but:
It is going to cost you more than you may need to spend
It may cost you more on an ongoing basis due to energy and maintenance costs
It might run less efficiently than a right-sized system
Contractors often resist bringing in engineering experts to seemingly reduce costs, even if those experts can help make decisions that result in lower cost. It may be a good idea to consult an Engineer before choosing your final system. Technical assistance from Palo Alto Utilities can help!
-
Sometimes (but not always), a simple equipment replacement by a contractor will work out just fine. However, there are some clear cases where you should not proceed without consulting a Professional Engineer.
An engineered solution is recommended when:
Much of the gas-consuming equipment has significant useful life remaining
The building has infrastructure or space limitations to replacing existing gas-fired equipment with electrical counterparts. (for example, when a larger building has a central HHW boiler, or when there’s limited available electrical capacity)
Multiple different types of systems in the building need to be replaced (e.g., AC, Boilers)
Other parts of the building are also being refurbished (e.g., windows, roof) that might change the optimal size of equipment
For more assistance in this matter, Palo Alto Utilities has Technical Assistance available (link!)
-
Most of the measures listed require permits. For more information, visit: https://www.paloalto.gov/Departments/Planning-Development-Services/Development-Services/Start-the-Permit-Process
Equipment Lists
Additional Resources
CPAU Business Customer Rebates Catalog
Technical Assistance is available through PAU (assignment to ProspectSV team)
Courtesy contractor list (Shelby is working on this, can link to it when it’s ready)